ISO 21725-2:2021
p
ISO 21725-2:2021
71513
недоступно на русском языке

Текущий статус : Опубликовано

ru
Формат Язык
std 1 216 PDF + ePub
std 2 216 Бумажный
  • CHF216
Пересчитать швейцарские франки (CHF) в ваша валюта

Тезис

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

—    the use of continuity and redundancy to provide one or more alternate paths;

—    structural members and bearing seat widths that are resistant to damage or instability; and

—    external protection systems to minimize the effects of reasonably conceived severe loads.

Preview 

Вы можете ознакомиться с данным стандартом в нашей онлайн-библиотеке (OBP)

Общая информация

  •  : Опубликовано
     : 2021-11
    : Опубликование международного стандарта [60.60]
  •  : 1
  • ISO/TC 71/SC 5
    93.040  91.080.40 
  • RSS обновления

Жизненный цикл

Появились вопросы?

Ознакомьтесь с FAQ

Работа с клиентами
+41 22 749 08 88

Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)