This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).
This document specifies the phases required for the BACS project, including
— design (determination of project requirements and production of design documents including technical specifications),
— engineering (detailed function and hardware design),
— installation (installing and commissioning of the BACS), and
— completion (handover, acceptance and project finalization).
This document also specifies the requirements for as-built documentation and training.
This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.
Общая информация
-
Текущий статус: ОпубликованоДата публикации: 2024-01Этап: Опубликование международного стандарта [60.60]
-
Версия: 2
-
Технический комитет :ISO/TC 205
- RSS обновления
Жизненный цикл
-
Ранее
ОтозваноISO 16484-1:2010
-
Сейчас
-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00